To read the entire announcement from the HOA, click here: Linden Tree Project Notice-2018 January 29th
Below is the breakdown of scheduling:
- 2/5-2/8: Morrison St. tree removals & stump grinding (General Tree)
- 2/8, 2/9, 2/13: Morrison St. debris removal (Willamette)
- 2/13-2/14 (if needed extended thru 2/16): Windwood Way tree removals & stump grinding (General Tree)
- 2/13-2/16: Morrison St. irrigation repairs and tree install (Willamette)
- 2/19-2/23: Windwood Way debris removal, irrigation repairs, tree install (Willamette)
- 2/23, 2/26: Signage removed (Willamette)
- After 4/15: Grass seed installed all areas (Willamette)
Snowcone Snowbell (Styrax japonicus) will be placed on SW Morrison. Here is an example of a mature tree : snowconesnowbell pdf
Fireburst Paperbark Maple Acer griseum will be placed SW Windwood. Here is an example of a mature tree with its Fall color: fireburst paperbark maple pdf
Here is what the trees will look like when they first go in: